"First line, the whole project 2016-2017.
It is that, in response to the proposal of the government team presented today on mobility in the first line and the area of llenaire and pinaret, exposing an outline to reach the end of the project whose first phase ends on 4 May and I will continue as from next month of November with anticipated completion before the holy week 2017.
For starters, we'll say that the current work, which is limited to the enlargement of the sidewalks on both sides of the walk, it's just the basis on which the improvements will be of aesthetic and practical nature that will shape the future ride. The remaining work until the beginning of may, in addition, obviously, the end of the extension of the sidewalks and the trees are the following:
1. Placement of pedestrian crossings elevated to the level of the sidewalks to avoid barriers.
2. Identify a provisional bike lane with brands of paint.
3. Implement the layers of resin of termination on the sidewalks, after the cleaning and polishing of concrete pattern.
Starting in November will begin the work of the second phase, which are the following:
1. Vehicle Lane paved the walk in the section between Avenue Paris and the square engineer rock. The pavement, Color Tobacco, will be at the level of the sidewalks to that whole area can peatonalizarse in whole or in part.
2. Construction of a bike lane attached to the sidewalk on the side of the sea with a width of 2 meters, elevated to the level of the new pavement for more safety and security of cyclists.
3. Reconstruction of murette of separation from the beach that will be done with hard-seas of color ochre.
4. Installation of street furniture and ornamental gardening.
The finished project will, according to the technicians, thanks to the contrast of colors and textures between the sidewalks, the pavement, the stone of murette and the sign of the cycle track-a final result nice and very attractive.
Adicionalente to this technical project, it is working in the studies of improvement of the street bot, the asphalt and the connection of the two sections of the street roure, the upgrade and expansion of the tracks in the surroundings of the hotel pollensa park (Fergus) And the acquisition of land for the construction of parking spaces in the second line in llenaire and the pinaret.
From this party, in addition, and despite the opposition of the owners of the gola, we will continue to work to get the construction of a parking lot in the sandlot located on the top of joan xxiii in front of the supermarket eroski. We believe that, while preserving the integrity of the park of the gola, the site allows you to design a parking space with large areas of gardening, trees and motives of traditional architecture that embellezcan the entrance to the port and improve our ability to reception and parking of vehicles.
So, we're just watching, at the moment, the basic structure of an ambitious project that has been made possible thanks to the work of the current government team that manages and improvement, and of the previous team that carried out the initial design and lawful. To both, thank you very much."