B
Bircho
Member
Can't find anything on the Pollença council page about the results but this is from Diario de Mallorca:
Adapted swings, first citizen demand
Last week the deadline to vote for the projects that should be part of the participatory budgets ended and a total of thirteen performances have been selected so that they can be financed with the 200,000-euro item authorized by the Consistory for the chance.
The project most voted by the citizens is the provision of adapted swings for children with reduced mobility problems, which obtained 359 points. In the second place, the participants opted for the rehabilitation of the playgrounds for children and primary school of the Joan Mas public school, as well as the creation of leisure spaces with furniture. The social issues have been, in general, the most voted by the citizens of Pollença.
I can't remember if it was 16 or 18 projects to be voted on but 13 have won funding. Don't know what the other 10 are (hope the skatepark isn't one of them
)
Adapted swings, first citizen demand
Last week the deadline to vote for the projects that should be part of the participatory budgets ended and a total of thirteen performances have been selected so that they can be financed with the 200,000-euro item authorized by the Consistory for the chance.
The project most voted by the citizens is the provision of adapted swings for children with reduced mobility problems, which obtained 359 points. In the second place, the participants opted for the rehabilitation of the playgrounds for children and primary school of the Joan Mas public school, as well as the creation of leisure spaces with furniture. The social issues have been, in general, the most voted by the citizens of Pollença.
I can't remember if it was 16 or 18 projects to be voted on but 13 have won funding. Don't know what the other 10 are (hope the skatepark isn't one of them