I am back a few weeks now, so not quite up to date. At that time the route of the road was evident and ground preparations well advanced but I don't think any tarmac had been laid. Given how long it has taken to get this far I reckon it will be a few more months yet before it is completed.
At Easter we drove down part of it (the middle section, as it's barriered off at the ends) so it couldn't have been too bad although there was still the odd lamp post still sitting in the middle of the carriageway which you had to drive around!
Perhaps the lamposts will stay as a feature tee hee, we are used to dodging them on the pavements after all.Only 28 days and i can get my PP fix. Thanks for the update.