• Join the Puerto Pollensa Community Forums

    Provide or get advice on everything Puerto Pollensa, ask questions, gain confirmation or just become apart of a friendly, like minded community.


    Join our Community!

Road closures.

  • Thread starter Thread starter Sparky
  • Start date Start date
Thanks.
I have a 9am meeting in Port Soller the same day.
Was going to go the Lluc way.
No more.
 
Many thanks Sparky - we are out this coming week so this is (as always) very helpful.
shaun
 
Here is a translation of an UH report, the original can be seen here :- El Consell mejorará la carretera Pollença-Alcúdia » Part Forana » Noticias » Ultima Hora Mallorca

The Consell improve road Pollença-Alcúdia


The Consell de Mallorca will start next Monday the work of strengthening and improving the containment system in Pollença-Alcúdia road (Can Bisanyes). As reported by the insular institution in a statement, this route will be closed from Monday to Friday from 08.00 to 19.00 until 16 May . the Consell improve this way since it is a stretch where the firm is very deteriorated and aged. The work has been awarded to the company Matias Arrom Bibiloni, the budget for the project is 931,861.56 euros and the execution period is three months. Specifically, first carry out the cleaning of sidewalks and removal of firm contaminated. Then he will start with the paving of the entire pathway and wooden barriers will be installed to improve containment systems to those most dangerous areas. The Consell recommends that locals use secondary roads to move while the work. Finally , the department of Planning and Infrastructure has apologized to all the people who could be affected by the works and recalled that all information on incidents on the roads can be found on the map of incidents of Consell.
 
The road in question is the Ma-2201, this is the road that runs from the cockerel roundabout in Pollensa all the way up to the main road into Alcudia, there are a lot of villas on this road so you may need to find an alternative route Monday to Friday from 08.00 to 19.00 until 16 May!
 
This has been posted on FB by the local police :-

8 de maig
IV cursa Cala Sant Vicenç Coves Blanques.

Recorregut:
Carrer Temporal, Dionís Bennàsar, Torrent, Cala Molins, Can Botana, Cala Molins, Marassar, Cala Clara, Mirador, Avinguda Cavall Bernat, Coves Blanques, Bruixola, Maressers i carrer Temporal.
Inici devers les 8:30 hores del matí.

Important! La parada de bus del carrer Temporal estarà fora de servei, de les 08:00 hores fins les 14:00 hores. Les parades més pròximes les trobareu als carrers Cavall Bernat i Cala Molins.

8th of may
IV RACE CALA SAN VICENTE CAVES WHITE.
Tour:
Temporary Street, Dionysius Bennàsar, torrent, Cala Isle, can botana, Cala Mills, marassar, Cala Clara, Belvedere Avenue, horse cave, Bernard White, bruixola, maressers street and temporary.
Start Devers 8:30 hours of the morning.
Important! The bus stop in the street will be temporary out of service, from 08:00 a.m. until 14:00 p.m. The stops more coming the streets find horse Bernard and Cala Mills.
 
This has been posted on the UMP FB page :-

Unió Mollera Pollencina Page Liked · 16 hrs · Edited · RESTRICCIONES DE CIRCULACIÓN EN CENTRO DE POLLENÇA EL SÁBADO 10 DE SEPTIEMBRE. La Policía Local ha anunciado restricciones de circulación entre las 8 y las 13 horas y desde las 15 hasta las 20 horas del sábado 10 de Septiembre por la celebración del Down Urban ciclista. Se veran afectadas las zonas de Calvari, Guillem Cerdá, Creus, Porquer, Montisión, Moro, Ramón Picó, Temple y Plaça Major.


ENGLISH

TRAFFIC RESTRICTIONS IN CENTER POLLENÇA SATURDAY 10 SEPTEMBER. Local police announced restrictions on movement between 8 and 13 hours and from 15 to 20 hours Saturday 10 September for the celebration Down Urban cyclist. Be affected zones Calvari, Guillem Cerda, Creus, Porquer, Montisión, Moro, Ramón Picó, Temple and Plaça Major.
TRANSLATE THIS PAGE OPEN IN GOOGLE TRANSLATE
 
The Thomas Cook Ironman Mallorca takes place this Saturday 24th.

Here are some of the road closures: 07.30-17.30: Playa de Muro (Banca March roundabout) to Magic roundabout. 07.30-11.00: Playa de Muro (Banca March roundabout) to Can Picafort (Eroski roundabout). 08.00-11.30: Can Picafort to Maria de la Salut and beyond. 09.30-17.30: Muro to the Fish Hook roundabout (Puerto Alcudia / Playa de Muro boundary) via Sa Pobla and Es Murterar. 10.00-18.00: Sant Marti bypass (behind Bellevue) to the Es Murterar roundabout. 10.00-14.30: Alcudia to Puerto Pollensa and on to Pollensa. 10.00-15.30: Pollensa into the mountains via Lluc. 11.00-16.30: Selva to Muro via Campanet and Buger.
 
Buger. My sister is having a lunch party on Saturday midday here in Pollensa, and quite a few people are coming up from Palma.
 
This has been posted on FB by the Policia Local :-

14570423_1130368363682950_6097138445442499656_n by lyn.sparkes, on Flickr

Dimecres dia 5 d'OCTUBRE es durà a terme la 3° etapa de la XIX CHALLENGE VOLTA A MALLORCA PER A MASTERS

MASTERS 50 i 60
Sortida a les 9 hores del passeig Saralegui davant el Rte. Tolo's

MASTERS 30 i 40
Sortida a les 11:10 hores del passeig Saralegui davant el Rte. Tolo's

La circulació de vehicles del Passeig i del carrer Joan XXIII estarà afectada en el moment del pas dels ciclistes i de l'entrega de trofeus.

ENGLISH.

Wednesday 5th October will be conducted on the 3th stage of the nineteenth century challenge ride in Mallorca for masters
Masters 50 and 60
Departure at 9 a.m. walk saralegui before rte. Tolo's
Masters 30 and 40
Departure at 11:10 a.m. walk saralegui before rte. Tolo's
The movement of vehicles of the walk and the street john xxiii will be affected at the time of the passage of cyclists and the delivery of trophies
 
And again tomorrow :(.

Policia Local de Pollença

14568048_1130377313682055_1213856375736966273_n by lyn.sparkes, on Flickr


Amb motiu de la celebració de la XIX CHALLENGE VOLTA A MALLORCA PER A MASTERS, 4° etapa contra rellotge individual, dijous dia 6 d'OCTUBRE els carrers de la urbanització de Gotmar, carrer Corb Marí, via de circumval·lació MA2220, camí de Llenaire (fins ca na Volantina) quedaran tancats al trànsit de les 9.00 a les 14.00 hores aproximadament.

Moltes gràcies i disculpau les molèsties.


On the occasion of the celebration of the century challenge ride in Mallorca for masters, 4° stage against the clock, Thursday 6th October the streets of the development of gotmar street, cormorant, via the ring road Ma2220, Llenaire Road (up ca na volantina) will be closed to traffic from 9.00 a.m. to approximately 14.00 hours.
Thank you so much and disculpau the inconvenience.
 
This has been posted on FB by the Policia Local :-

MUNTATGE LA FIRA
Aquesta setmana començaran a muntar la Fira a diferents carrers del poble, per això us demanam que us fixeu en la senyalització de prohibit estacionar dels carrers: Cecili Metel, av. de l'Argentina, Reina Maria Cristina, via Pollentia, Miquel Bota Totxo, Convent, Sant Domingo, Jaume III, Campos, Bartomeu Aloy, Pont Romà, etc.
Disculpau les molèsties i gràcies per la vostra col·laboració.
Mounting the fair
This week will start at the fair to ride the streets of the town, that's why we ask you that you look at the signs of parking in the streets: Caecilius Metellus, av. From Argentina, Queen Maria Cristina, via pollentia, Michael Boot Posse, Convent, Santo Domingo, James III, Campos, Bartolome Aloy, Roman Bridge, etc.
Disculpau the inconvenience and thank you for your cooperation.
 
Re-surfacing work has started on the Pollensa road, the road won't be closed completely but there is bound to be disruption at times. The Ma-2200 from the Cockeral roundabout in Pollensa to the Aeroplane roundabout in Puerto Pollensa and the Ma-2203 for access to the Cala San Vicente is to get a new surface at a cost of 1.721.291,47€ and work will last up to 3 months.
 
I didn't recall there being much wrong with the surface back in August, so timely maintenance is to be applauded - like, don't wait till the roof leaks before taking action.

I have the number for Lancashire County Council if the powers that be would be minded to sell on the second hand surface for re-use in our neck of the woods.:rolleyes:

Austerity and dubious officialdom have taken the toll of any ability to maintain the roads and much more.
 
Last edited by a moderator:
Back
Top